Environmental Systems, Inc. Case Study
Medical care systems must be able to continue without disruption during utility outages; this is why hospitals have backup generators to kick in during power losses. Similarly, MRI machine operation during an electrical outage requires a chiller system with these same fail-safes built in. As Mike from Environmental Systems, Inc. put it, "When our medical imaging clients can’t scan, they’re losing money and compromising patient wellbeing." A Cape Cod client faced additional obstacles, including a tight rooftop footprint for the chiller system and the threat of corrosion from the ocean air.
This case study outlines how Drake provided ESI with a custom-engineered chiller system that keeps the client’s MRI units running in all conditions, thanks to a 99% uptime. Fill out the form to access the full document.